Coke oven gas recovery

Boosting steelmaking efficiency: In order to use the process gas into a 2MW steam boiler, we have recently supplied a gas booster with knock-out drum for fine filtration of solid contaminants and temperature control system to cool the gas at the temperature required by the burner.
 

Client: ArcelorMittal
Country: Bosnia
 
ArcelorMittal is the world’s largest steel company, with a presence in more than 60 countries. It has led the consolidation of the international steel sector, and is today considered the only truly global steel producer.
 
> Find out more about the case study in this link.
> Download the Industrial Gas Solutions data sheet.
 

 

Scroll to top
TOP
Please turn to portrait for a better experience

Please turn to portrait
for a better experience